Flooring estimate template: the three places a flooring estimate goes wrong

Flooring estimates go wrong in the same three places every time, and none of them is the floor covering. The subfloor has to be flat and sound and nobody knows whether it is until the old covering is up. The removal and disposal of what is there is real labour and real tipping cost. And the trims, thresholds, underlay, adhesive and door easing are a long tail of small lines that are individually trivial and collectively decisive.

Measure the area, then price the preparation separately

The covering is the easy number. Levelling compound, ply overlay, screw-down of a squeaking subfloor and damp-proof membrane are the lines that turn a quoted job into a loss. Carry them as an allowance with a rate beyond it, and say that the subfloor is assessed once the old covering is out.

Removal and disposal are a job of their own

Lifting old carpet, vinyl or tile, dealing with adhesive residue, and disposing of it are hours and fees. Tiled floors in particular are slow, and an estimate that treats removal as an afterthought is an estimate that loses a day.

The tail a flooring installation estimate template must list: trims, thresholds, underlay and doors

Beading, scotia, thresholds at every doorway, underlay, adhesive or clips, and easing the doors so they close over the new height. A flooring installation estimate template earns its keep by listing them so none is forgotten, because each one is small enough to absorb and there are always eight of them.

Questions people ask about flooring estimate template

How many boxes of flooring do I need?

Take the measured area, add the waste your layout produces, then divide by the coverage printed on the box and round up. Coverage differs between products, so a box count from one product does not transfer to another.

Should the estimate include subfloor work?

It should include an allowance with a stated rate beyond it, and it should say the subfloor is assessed after lifting. Promising a flat subfloor you have not seen is the most expensive assumption in flooring.

What about furniture?

Name it in or out of scope. Moving and replacing furniture is time, and a customer who assumed it was included and a contractor who assumed it was not is the argument that starts the job badly.

Sources

Related answers

Start Jobcardo ProGet Jobcardo Pro, $25 a month