Roofing estimate template: the lines that stop you losing money on a roof

Work order total
$863.16
Labour
$510
Parts, marked up
$288

Every figure on this page is computed from the inputs entered, by the method stated below it. Jobcardo publishes no tax rate, no wage figure and no trade standard: the rate, the markup and the tax on the parts line are yours, and the defaults are a worked example to replace with your own figures.

A roofing estimate template is a sheet with the right lines on it: measured squares, tear-off layers, underlayment, shingles or membrane, flashing by location, ridge vent by the foot, disposal, permit, and a stated waste allowance. Its value is that it stops you forgetting the lines that lose money, which are almost always disposal, flashing and the second layer nobody mentioned on the phone. The template is the discipline; the arithmetic underneath it is what a roofing bid calculator does for you, and the priced sheet is what becomes the job.

Try the free worksheet Free to use. No account, no card, no sign-up.

How to estimate a roofing job: measure the roof before you write anything

Length by width per plane, the pitch multiplier for the slope, and then the count of ridges, hips, valleys, eaves and penetrations. Write the measurements on the estimate itself. An estimate whose quantities cannot be checked is an argument waiting to happen when the crew orders material.

Price the lines that are usually forgotten

Tear-off by layer, dumpster and haul, flashing at chimneys, walls and skylights, boot replacement, deck repair at an hourly rate with a stated allowance, and the permit. These are the lines that turn a quoted job into a break-even job when they are handled as favors on site.

Turn the accepted estimate into a dated record

How to estimate a roofing job ends with the customer accepting a number. What happens next decides whether the number holds: the accepted scope becomes a work order with the same lines, deck repair beyond the allowance becomes a signed change, and the invoice reads the record rather than the memory.

Roofing estimate template: common questions

What should a roofing estimate template always include? Measured squares and the pitch used, the waste allowance as a percentage, tear-off by number of layers, disposal, all flashing by location, ventilation, an explicit deck repair allowance with a rate beyond it, the permit, and the payment terms. Anything routinely done on site and not listed will be done for free.

Is a roofing bid calculator accurate enough to quote from? It is accurate for the arithmetic and only as good as your inputs for the price. A calculator that uses your own material and labor figures gives a quotable number; one that uses a national average gives you a starting point that needs checking against your last three invoices.

How do I price deck repair I cannot see? With an allowance and a rate. State that the estimate includes replacement of, for example, two sheets of decking, and that further replacement is charged at a named price per sheet, signed before the work is done. That is one line and it prevents the most common roofing dispute.

Jobcardo Pro

Keeping what you raise

The worksheets are free forever. Pro turns them into the record: every order you raise kept against the customer with its status from raised to done to invoiced, every change dated, your company name and logo on the sheet, no watermark, and an export when the bookkeeper asks.

  • Download as PDF
  • No Jobcardo watermark
  • Save every work order and sales order and reopen it later
  • Your business name and logo on the sheet
  • Export every order and worksheet in one go
  • Job-done and balance-due reminders emailed to your customers
  • Connect your own Stripe account and get paid online
  • Connect your QuickBooks Online or Xero

$25per month, whole team

Start Jobcardo Pro Free for 14 days. No card needed. Pricing

The first 14 days are free and no card is asked for. Add a card during the trial and the first charge is on the day it ends; do not, and your workspace becomes read-only with nothing deleted. Renews monthly at the price above until you cancel. We email you before any price change.

Will it do what you need for Roofing estimate template?

Tell us what your orders need and we will tell you straight whether Jobcardo Pro does it today, whether it is coming, or whether you need a different product instead. A person reads these and replies.

Send my question
Start Jobcardo ProGet Jobcardo Pro, $25 a month